Powerit Solutions

OM OSS KONTAKTA OSS      
Industrial & Commercial Energy Management Systems
 

Foundry/Metals

Savings Evaluation Questionnaire

You must javascript enabled to use this form


* Indicates a Required field

Company Information:
Company Name:*
Contact Name:*    
Title:
Email:*  
Phone:
Note: All information supplied is confidential and will be for Powerit Solutions' use only and will not be distributed outside of Powerit Solutions.

Utility/Load Information:
Name of Utility:
Number of billed meters:
Utility Rate Schedules (This information can be found on your utility bill.):
Please fax or email a utility bill from the past 12 months.
If you are unable to provide utility bills please provide the following:
January:
Total kWh: Peak kW: Estimated Monthly Demand Charges:
April:
Total kWh: Peak kW: Estimated Monthly Demand Charges:
July:
Total kWh: Peak kW: Estimated Monthly Demand Charges:
October:
Total kWh: Peak kW: Estimated Monthly Demand Charges:

Please provide electronic kW interval data for 1 month, 12 months is preferred.
Operational Schedules (24x7, 8a-5p, seasonal, etc):
Do you currently have an energy management system?
Yes
No
If yes, please describe:
On-Peak Operation (10%, 50% etc):
Approximate square/cubic footage of facility:
Do you currently take action to control peak demand?
Manual
Automated
None
If yes, please describe:
Melt Process (Open Air, Vacuum, etc):

It is helpful for us to also evaluate a site map of your facility. We'll look for key installation locations such as furnace, power supplies, operator stations, network locations, etc. Please email or fax a single site map if possible.
Power Supply Information:
Please complete the following table for each power supply in the facility.
Manufacturer
(Ex: ABB, Inductotherm)
kw Load
(Ex: 500 HP)
Melt Cycle Duration
(Ex: 10 min, 45 min)
Type of Control
(Ex: Rheostat Potentiometer, PLC)